The existing roof drainage system was overloading and flooding in heavy rainfall. Palatine surveyed the roof and drainage systems and obtained a new hydraulic design involving re-routing the pipework system for greater discharge. A maintenance regime for cleaning was provided to mitigate the flooding due to blockages.
1